Quotation questions for multi-needle offers
Which currency and trade term should match?
Pick one currency and one incoterm before you rank unit prices. EXW at the factory, FOB at a named port, and DAP to the US door are different delivered cost stacks. Duties and inland freight need their own lines when the term stops short of the sewing floor.
How should packing and freight be shown?
Ask for crate dimensions, gross weight, and whether the heads ship assembled or split. A quote that says freight extra cannot be ranked against a quote that folds freight into DAP until both numbers are visible.
Where do consumables and spares sit?
Thread, needles, bobbins, and a spare parts list are operating items. If one offer bundles a starter kit and another does not, note the kit as a separate amount instead of calling the bare head cheaper in a general sense.
What commissioning text is enough?
Look for days, trainer count, and whether travel is included. A single word such as installation does not say who wires the input voltage or who checks the first design file on the control interface.
Can two offers be ranked before deviations are listed?
No. Each specification deviation should name the brief line it changes, such as needle count, sewing field, or cap-frame diameter. Until that list exists, the offers are not on one basis.